Townhouses & Grouped Dwellings
Planning townhouses or grouped dwellings on land you own? 5 Riverz Development undertakes residential multi-dwelling construction for landowners, investors and small developers in Perth. We can work from supplied building plans or arrange drafting, with each proposal assessed against its site, design and required approvals.
We provide a construction service, not property sales, and cannot assume every proposed configuration will be approved for that block.
Construction Options and Support
Depending on your plans and site requirements, a residential multi-dwelling build may involve construction services and coordinated preparation before approved work can begin.
Townhouse Construction
Grouped Dwelling Construction
Building From Plans
Drafting Coordination
Technical Documentation
Building Permit Coordination

Happy Customers
Read Reviews...

I had owned a residential block for some time and was trying to understand whether building townhouses would be a sensible next step. I did not want a builder to assume that having a sketch meant the project was ready to start. What mattered to me was discussing the site, the proposed homes and the approvals that still needed to be considered. Having those matters separated made it easier to see what information I needed before moving towards construction.
Townhouse Development Planning
⭐️⭐️⭐️⭐️⭐️
Our investment plans involved more than one dwelling, and we already had drawings prepared for the site. I wanted to speak with a residential builder who would look at those plans as the starting point rather than trying to sell us an unrelated property package. The most useful part of the discussion was understanding what needed to be clarified before construction could be quoted properly. It helped us focus on the actual building scope instead of making assumptions about what was included.
Residential Construction Scope
⭐️⭐️⭐️⭐️⭐️
This was my first time considering a small residential development, so I had plenty of questions about the difference between a building project and the planning work that comes beforehand. I wanted to understand who would be responsible for each stage rather than discovering gaps after making commitments. A straightforward conversation about the land, the proposed dwellings and the approvals was the kind of guidance I needed. It gave me a more realistic starting point for the decisions ahead.
Residential Development Guidance
⭐️⭐️⭐️⭐️⭐️
I knew what I wanted to achieve with a grouped-dwelling project, but I did not yet have construction-ready plans. My main concern was finding out whether I had to organise every drawing before approaching a builder. Being able to discuss drafting arrangements alongside the proposed construction was helpful. I also wanted a clear distinction between an initial quotation and any separately agreed design work, as that would affect how I planned the next steps.
Construction Drafting Arrangements
⭐️⭐️⭐️⭐️⭐️
When I started looking into townhouses, I assumed the term described everything I needed to know about the development. I soon realised that the actual arrangement of the homes and the site's planning classification could matter more than the label. I wanted a builder who would not treat every block as suitable for the same configuration. Discussing the idea in terms of the site and its requirements helped me ask better questions before proceeding.
Townhouse Planning Classification
⭐️⭐️⭐️⭐️⭐️
Our family was considering building several homes on land we already owned rather than buying separate completed properties. We needed to understand whether a grouped residential construction project could suit what we had in mind. It was important to keep the conversation focused on the buildings themselves while being realistic about what still needed planning advice or approval. That distinction made the early discussions more useful and helped us organise the information for a proper project assessment.
Grouped Residential Construction
⭐️⭐️⭐️⭐️⭐️
I was comparing builders for a townhouse proposal and wanted to know what would happen if we changed details after work had started. On a project involving several dwellings, even one design adjustment could have wider consequences. The explanation that changes would need to be documented, assessed for cost and timing, and approved in writing was particularly relevant to me. I value knowing how decisions will be handled before committing to a construction agreement.
Construction Variation Process
⭐️⭐️⭐️⭐️⭐️
The uncertainty around timing was one of my biggest concerns when planning a multi-dwelling build. I did not expect anyone to promise a completion date before the plans, approvals and site requirements were understood. What I wanted was a realistic conversation about the factors that could affect the work and what information a builder would need. Being clear about those unknowns made it easier to plan responsibly rather than relying on an attractive but unsupported estimate.
Multi-Dwelling Construction Timeline
⭐️⭐️⭐️⭐️⭐️Questions About Multi-Dwelling Builds
Can you build on land I own?
Yes. 5 Riverz Development accepts townhouse and grouped-dwelling construction enquiries from landowners, investors and residential developers. The company currently works with customers who own their land, and each proposal is considered against the intended dwelling arrangement, site conditions and necessary approvals. We do not currently offer house-and-land packages.
What is a grouped dwelling in WA?
Under Western Australia's Residential Design Codes, a grouped dwelling is one of two or more dwellings on the same lot, generally without one dwelling positioned above another. “Townhouse” is a familiar building description, not a substitute for the relevant planning classification. The local authority must assess what is permissible for the particular site.
Can you build from plans already prepared?
Yes. You can bring your existing residential building plans for discussion. If you do not yet have suitable drawings, 5 Riverz Development can arrange drafting based on your requirements. Detailed drafting is not automatically part of a free initial quotation and would be handled through the relevant agreement.
Do you provide subdivision or development finance?
Neither subdivision consultancy nor development finance is a confirmed part of this construction offering. The company also does not sell land or completed off-the-plan townhouses. If your proposal requires subdivision, specialist planning advice or finance, establish those responsibilities separately rather than assuming they are included in a building contract.
Can every block accommodate several dwellings?
No. The number and arrangement of dwellings that may be allowed depend on the site and applicable planning requirements. A proposed layout, zoning or initial drawing does not itself guarantee approval. Site-specific feasibility and any required planning decisions need to be established before construction is treated as ready to proceed.
Who arranges technical documents and building permits?
For accepted residential building projects, the company's general process includes coordinating relevant technical documentation and building approvals. The documents required can differ from project to project. The exact division of responsibilities, including any planning or subdivision specialists, should be confirmed for your proposal rather than assumed.
How long does multi-dwelling construction take?
There is no confirmed standard completion timeframe for townhouse or grouped-dwelling projects. Duration depends on the proposal's design, approvals, site conditions, construction scope and agreed arrangements. A realistic programme can only be discussed once the project details are better understood; a fixed finish date should not be assumed.

Phone Number
+61 420 427 973
Business Location
Canning Vale South, WA, 6155, Australia.
E-Mail ID
[email protected]Discuss Your Dwelling Project
Own a site and considering townhouses or grouped dwellings? Use the enquiry form to tell us where the land is located, how many dwellings you are proposing, and whether you already have plans or approvals. You can also describe any questions about construction scope or drafting. We’ll use those details to understand your proposal and discuss a free initial quotation.
Construction With Clear Scope
A Practical Approach to Multi-Dwelling Builds
Multi-dwelling proposals need a clear starting point: the land, the intended dwelling arrangement and the status of plans and approvals. We discuss those details before treating a project as suitable, rather than assuming a particular configuration can be built on any block.
You can approach us with plans already prepared, or discuss having drafting arranged through 5 Riverz Development. Director Manjeet Singh meets with prospective customers and checks construction progress, keeping the early project conversation connected to the work being considered.
During construction, progress updates are provided by email. If a change is requested after work begins, we identify its effect on cost or time and document the variation for approval before proceeding. That matters when decisions across several dwellings need to stay aligned.
Preparing Your Multi-Dwelling Project
| Project Stage | What to Prepare | Next Step |
|---|---|---|
| Concept on Owned Land | Proposed dwelling types, number and site details | Discuss the proposal and construction suitability |
| Plans Not Yet Prepared | Site information and intended dwelling arrangement | Discuss drafting arrangements and separate agreement terms |
| Existing Plans Available | Building drawings and proposed construction scope | Provide plans for project assessment |
| Planning Position Uncertain | Applicable site restrictions and approval requirements | Seek appropriate site-specific planning advice |
| Approvals Underway | Application status and outstanding technical documents | Clarify requirements before approved construction begins |
Six Checks for Multi-Dwelling Projects
Understand these important considerations before moving forward with your townhouse or grouped-dwelling project.
-
01 Construction, Not Property Sales
This is a residential building service for landowners and suitable development proposals, not a way to purchase land or completed townhouses.
-
02 Site Capacity Comes First
The number and placement of proposed homes must suit the block and relevant planning requirements. A townhouse concept alone does not establish what the site permits.
-
03 Check Planning Responsibilities
Building approvals and technical documents may be coordinated for accepted projects, but subdivision advice, specialist planning and financing should not be assumed part of the construction service.
-
04 Free Quote, Separate Drafting
An initial quotation is free. If detailed drawings need to be prepared, drafting work is arranged under the relevant agreement rather than included automatically.
-
05 Allow for Project Variables
There is no confirmed standard completion timeframe for multi-dwelling builds. Design, site conditions, required approvals and construction scope all influence what can be scheduled.
-
06 Agree Changes in Writing
Requests made after construction starts are assessed for cost and timing effects. Any variation is documented and approved before the changed work proceeds.