New Home Builds
Planning a new home on your own block in Perth? 5 Riverz Development builds custom single-storey and double-storey houses around your requirements, whether you already have drawings or need drafting arranged.
We discuss your preferred layout, review the proposed project and coordinate the documentation and approvals needed before construction. The design and building approach depend on your land, project requirements, applicable approvals and site conditions.
New Home Building Options
Depending on your block, plans and requirements, your new-home project may involve different house configurations alongside confirmed planning and construction support.
Custom Home Builds
Single-Storey Homes
Double-Storey Homes
Drafting Coordination
Building From Plans
Building Permit Coordination

Happy Customers
Read Reviews...

I was planning my first new home on a block I already owned and wasn't sure where to begin with a builder. Before moving too far into drawings and decisions, I wanted to understand whether my ideas were realistic. It was important to explain how we wanted to live in the house and ask practical questions about the site, plans and approvals. Having a clear initial discussion would make the whole project feel more manageable.
First Home Planning
⭐️⭐️⭐️⭐️⭐️
I was looking for a builder who could work with the house drawings we had already prepared. My main concern was finding someone willing to consider our plans and explain what would need checking before construction. I wanted a straightforward discussion about the proposed layout, the block and any technical requirements. Being able to use our existing plans, rather than starting again with a completely different design, was an important factor in choosing a building company.
Building From Existing Plans
⭐️⭐️⭐️⭐️⭐️
Our family was considering a double-storey home to make better use of the space available on our block. I had questions about how our preferred rooms and living areas could fit together, and I understood that the site would need proper assessment. I wanted these details discussed before making assumptions about what could be built. Having a builder who could explain the possibilities for a custom two-storey home and outline the next planning steps was important to us.
Custom Double-Storey Home
⭐️⭐️⭐️⭐️⭐️
I preferred a single-storey home because I wanted all our everyday living spaces on one level, without adding unnecessary rooms just to make the house bigger. My main challenge was fitting our ideas onto the block while keeping the layout practical for everyone living there. I wanted to discuss our room priorities and understand what needed to be confirmed through the plans and site assessment. A practical design suited to our needs mattered more to me than choosing from a standard catalogue.
Practical Single-Storey Layout
⭐️⭐️⭐️⭐️⭐️
I had a clear idea of the home I wanted but didn't have building drawings prepared. I wanted to know whether the building company could help arrange drafting rather than having to organise everything myself. It was also important to understand the difference between an initial free quotation and any separately agreed drafting work before making a commitment. Being able to discuss our requirements and understand the planning process would help me make an informed decision.
Home Design Drafting
⭐️⭐️⭐️⭐️⭐️
The building approval process was one of my biggest concerns when I started planning a new home. I wasn't sure which documents might be required or how the proposed design and conditions of the block could affect the process. I wanted to understand who would coordinate the technical information and building permit requirements, without assuming approvals were guaranteed. Having a realistic explanation of these responsibilities was just as important to me as the house design itself.
Building Permit Requirements
⭐️⭐️⭐️⭐️⭐️
I knew our preferences might change as the home progressed, and I wanted to avoid misunderstandings about any adjustments. Rather than assuming changes would be simple or free, I wanted to understand how they would be assessed and agreed upon. Having written details of any additional costs or time involved would help our household make decisions together. A clear variation process was important because I wanted to understand the implications before approving changes to the original plans.
Building Contract Variations
⭐️⭐️⭐️⭐️⭐️
Communication was one of my main priorities when choosing a builder for our family home. I wanted to know who I could speak with about our original requirements and how progress updates would be shared throughout construction. Email updates suited me because I could refer back to previous discussions and decisions. Direct communication, documented decisions and a clear distinction between the original plans and any later changes were particularly important to me.
Construction Progress Updates
⭐️⭐️⭐️⭐️⭐️New Home Building Questions
Can you build from my existing plans?
Yes. We accept customer-supplied house plans and review them against the proposed project. Further technical documentation or changes may still be needed before construction, depending on the block, design and approval requirements. You can provide your drawings with your initial enquiry so we can understand the proposal.
Do I need to own land first?
Currently, our new-home construction service is intended for customers who have their own land. We do not offer house-and-land packages. When making an enquiry, provide the block location and any available site details so we can discuss your proposed home in context.
Do you build single-storey and double-storey homes?
Yes. We undertake custom single-storey and double-storey new-home projects. The appropriate design depends on your preferred layout, the property and relevant technical and planning requirements. Neither configuration is automatically suitable for every block, so the proposal must be assessed before construction proceeds.
Can you arrange plans for my home?
Yes. If you do not already have drawings, we can arrange drafting through our draftsman based on your requirements. The initial quotation is free, but detailed drafting is separately agreed and does not automatically form part of that free service.
What approvals are needed before construction?
Depending on the project, technical requirements may include engineering, energy assessment, soil information and a Certificate of Design Compliance. The relevant building permit and approval process must also be addressed. We coordinate applicable documentation and approvals, but exact requirements vary by design and site.
Is your initial home quotation free?
Yes. We provide free initial quotations based on your stated new-home requirements, and a site visit may also be included where needed. Free quotations do not mean that detailed drafting, engineering or all design work is free. These arrangements are clarified as the project progresses.
Can I request changes during construction?
Changes requested after construction begins are considered as variations. We identify associated additional costs and potential time extensions, document the proposed change in writing and obtain approval before the revised work proceeds. Whether a change is practical will depend on its nature and the project stage.
How long does a new build take?
The timeframe depends on your design, site conditions, technical documentation, approvals and construction scope. We do not promise a fixed completion period for every home. Timing needs to be considered against the actual project and agreed arrangements, with changes during construction potentially affecting the programme.

Phone Number
+61 420 427 973
Business Location
Canning Vale South, WA, 6155, Australia.
E-Mail ID
[email protected]Discuss Your New Home
Ready to discuss a new home on your own block? Use the enquiry form to share your suburb, property details, whether you already have plans, and the kind of single-storey or double-storey home you have in mind. We can use that information to begin a free initial quotation conversation and identify what may need clarification before planning or construction can progress.
A More Involved Approach
Why Build With Us?
At 5 Riverz Development, you can discuss your new home directly with company director Manjeet Singh. He meets prospective customers, takes time to understand their building requirements and checks construction progress. His practical background in residential construction also informs these early project discussions.
Whether you already have house plans or need drafting arranged, we can work with you to establish a suitable direction. We coordinate relevant technical documentation and building approvals, with decisions guided by the proposed design, site conditions and applicable requirements.
Clear communication remains important once construction begins. We provide progress updates by email, and customer-requested changes are managed through written variations that identify potential cost and timing implications before approval. This helps keep project decisions documented as the build progresses.
Single-Storey vs Double-Storey Homes
| Consideration | Single-Storey Home | Double-Storey Home |
|---|---|---|
| Room Arrangement | All rooms on one level | Rooms distributed across two levels |
| Everyday Access | No stairs between living levels | Consider stairs and movement between floors |
| Block Planning | Review ground footprint and outdoor space | Assess ground footprint and upper-level layout |
| Design Priorities | Plan room connections across one floor | Decide which rooms belong on each level |
| Site Suitability | Check proposed layout against block conditions | Check two-level design and engineering requirements |
Six Essentials Before Your New Home Build
Keep these practical points in mind when preparing your plans and discussing your proposed home.
Start With Your Block
Our new-home building service is for customers who already have land. Share your block’s location and available property details so we can discuss your proposed home in context.
Bring Any House Plans
Already have drawings? Include them in your enquiry. Existing plans can be reviewed against your proposed project, with further documentation or necessary changes discussed before construction.
List Your Must-Haves
Think about the rooms, layout and features that matter most to your household. These preferences help guide discussions and drafting arrangements if you do not already have plans.
Understand Quotation Scope
Initial quotations are free and based on your stated requirements. A site visit may be included where needed, but detailed drafting and engineering are not automatically included.
Allow for Site Checks
Your design and block conditions influence technical documentation and approvals. Engineering, soil information, energy assessment and building permit requirements are considered according to the individual project.
Changes Need Approval
Changes requested during construction are managed through written variations. Additional costs and possible time extensions are identified, documented and approved before the revised work proceeds.
From Your First Discussion to Handover
Understand how your new-home project generally progresses, from discussing your requirements to receiving your completed home. Individual stages depend on your plans, site and applicable approvals.
-
01
Initial Discussion
Tell us about your block, intended layout and requirements. We use that information to discuss the proposal and prepare a free initial quotation.
-
02
Plans and Design Selection
We review any drawings you already have, or arrange drafting to develop a proposed plan for your review and selection.
-
03
Technical Checks and Approvals
The project moves through relevant technical documentation, checks and permit requirements, which vary according to the design, site and applicable approvals.
-
04
Construction and Progress Updates
Once the required approvals are in place, construction progresses through the appropriate stages. Progress updates are provided by email as work continues.
-
05
Completion and Handover
Applicable completion notices, inspections and documentation are addressed before the finished home is handed over, with requirements depending on the individual project.
